Repair works at the Pier
Over the past few months of winter
a small hole under the bridge of the pier
grew bigger and bigger.
We are doing some extensive work to repair the hole
and build up the sea bed to protect the wall's foundation.
and build up the sea bed to protect the wall's foundation.
Six inch concrete blocks are brought to the place of operations
One by one the blocks weighing 15kg are passed along a chain of brothers
to the centre of the damage
In cave like conditions our young strong postulant lays the blocks in a stable pattern
This is not easy work!
The JCB digger is used to gather together stones from the sea bed at low tide.
The gathered stones are piled up to cover the work done
and protect the pier from further attack by the sea.